JP Srbijagas
Delta Inženjering has signed a contract relating to the design services of the main gas pipeline Niš-Dimitrovgrad. The engineering team of Delta Inženjering was engaged in the nostrification of the
Delta Inženjering has signed a contract relating to the design services of the main gas pipeline Niš-Dimitrovgrad. The engineering team of Delta Inženjering was engaged in the nostrification of the
Delta Inženjering has developed a project for installation of a new air compressor with capacity of 105.000Nm3/h for the needs of operation of the air separation plant at the factory of Messer
Delta Inženjering has signed a contract with Henkel factory Bileća on the preparation of preliminary and main designs for the factory complex of the adhesives factory Henkel in Bileća on 2 acres
Within the factory for production of pumps and pressure boosters Grundfos Serbia in Inđija has been constructed a very important facility – wastewater treatment and recycling plant.
The project for the construction of a flue gas desulphurization plant in TPP “Nikola Tesla A” in Obrenovac is one of the most important environmental investments by which EPS continues a
JKP Novosadska toplana – Design and construction of a boiler at TO Istok.
JKP Beogradske elektrane – conceptual design, basic design, project for the construction permit and project for construction and obtaining of administrative documentation for the cogeneration
Construction of bottles and technical gases warehouse within PD Energo sistem in Nova Pazova.
In Zrenjanin we adapt the administrative building of NIS Naftagas Tehnički servisi.