Clinical Center of Serbia
Ministry of Health
Construction, reconstruction, and adaptation of the central building of the Clinical Center of Serbia in Belgrade with accompanying buildings and exterior decoration.
The largest and most modern equipped health institution in Serbia – the new tower of the Clinical Center of Serbia covers 86,000 square meters, has 12 floors and a total of 825 hospital beds.
Clinical Center of Vojvodina in Novi Sad
Ministry of Health
Reconstruction and additional construction of lamellas B and C of the Emergency Diagnostic Center, additional construction of the warm connection with the Polyclinic and Internal Medicine and the construction of a technical building.
Covid Laboratory Beograd
Ministry of Health
Design and construction of a complete, state-of-the-art Laboratory (BSL-2) for COVID-19 in the Balkans, within the Clinical Center of Serbia, which is called “Fire Eye”. The total area of the laboratory is over 700m2. The capacity of the laboratory is 2,000 samples per day. This Laboratory is identical to the Laboratory in Wuhan.
Covid Laboratory Niš
Ministry of Health
In March 2020, the Ministry of Health of the Republic of Serbia decided to establish the laboratory “Huo-yan National Laboratory for Molecular Detection of Infectious Agents” as soon as possible within the existing Institute for Public Health in Niš.
The task was to create a prefabricated facility that will house a new laboratory intended for testing the presence of COVID-19 infection and the existing serology laboratory for appropriate tests.
Delta Inženjering has completed design and construction of a new laboratory for testing coronavirus samples under the name “Fire Eye” in the city of Niš, on area of 900 m2 in less than three months.
Institute of Molecular Genetics
Republic Directorate for Property of the Republic of Serbia
Works on the reconstruction and adaptation of the facility with the installation of turnkey equipment for the needs of the Center for Genome Sequencing and Bioinformatics.
The center was opened on December 9, 2021. Delta engineering performed complete works in just two months.