CB&I Lummus
Modernization of Oil Rafinery Pančevo
The modernization of RNP was achieved through the construction of new production and auxiliary facilities and the reconstruction of part of the existing facilities.
As a technical documentation designer, the Company Delta Inženjering was employed, and our designer team harmonized CB&I Lummus documentation with local regulations and made additional calculations and documentation.
Main Gas Pipeline (Interconnector)
from the Border of Bulgaria to the Border of Hungary
Delta Inženjering and JP Srbijagas signed a contract for the development of a project for construction for the purpose of carrying out works on the project – Main Gas Pipeline (Interconnector) from the Bulgarian Border to the Hungarian Border.
The length of the projected section of the main gas pipeline (interconnector) the Bulgarian border – the Hungarian border in the territory of Serbia is approximately 400 km from the starting point on the border with Bulgaria to the final point – on the border with Hungary.
The starting point of the main gas pipeline route on the territory of the Republic of Serbia is at the Bulgarian-Serbian border about 10 km southeast of the city of Zaječar. The final point of the main gas pipeline on the territory of the Republic of Serbia is at the Serbian-Hungarian border 4 km northeast of the village of Horgoš.
Distribution Gas Pipeline RG 05-06 Belgrade-Valjevo-Loznica
The gas pipeline is a single-pipe line facility with a total length of about 190 km, which is set up entirely underground.
The gas pipeline has a maximum working pressure of MOP 50 bar and will be made of steel pipes, namely: on sections from Belgrade to Valjevo, diameter DN500, and on sections from Valjevo to Loznica diameter DN400.
Gasification of South-West Serbia
This gas pipeline route includes distribution gas pipeline Zlatibor-Prijepolje with branch pipelines to Priboj and Nova Varoš, and distribution gas pipeline Glogovik-Sjenica, and five gas metering stations and all other necessary facilities for operation.
The gas pipeline is a single-pipe line facility with a total length of about 104 km, set up entirely underground. The maximum working pressure is 50 bar.
Gasification of East Serbia
Gasification of East Serbia represents the network of main and distribution gas pipelines at the east part of the country and includes all the necessary facilities for operation.
The gas pipeline is a single-pipe line facility with a total length of about 239 km, with diameter DN100 up to DN500, set up entirely underground. The maximum working pressure is 75 bar.
Distribution Gas Pipeline RG 11-02
Leskovac-Vranje
Preparation of project-technical documentation necessary for the realization of the distribution gas pipeline RG 11-02 Leskovac Vranje.
Delta Inženjering is designing the distribution gas pipeline RG 11-02 Leskovac-Vladicin Han-Vranje, from the technological tap behind the constructed branch for MMRS Vlasotince, approximately 63.5 km long, diameter ø 323.9 mm and maximum working pressure 50 bar, as well as MMRS Vladicin Han and MMRS Vranje.
Main Gas Pipeline MG 10
Niš-Dimitrovgrad
Delta Inženjering did all the technical documentation and designed the 100 km long gas pipeline from the Republic of Serbia to the Republic of Bulgaria (Nis-Dimitrovgrad line).
Nomagas
Section 7 of the Kičevo-Ohrid Main Gas Pipeline
Delta Inženjering and the Macedonian company Colenco signed a contract with Nomagas Skopje for the development of an urban project and environmental impact assessment study for the construction of the main gas pipeline on section 7 from Kičevo to Ohrid.
Messer Tehnogas AD Beograd
Air Separation Plant ASU 3 Bor
Messer Tehnogas, at its location in Bor, which is located in the immediate vicinity of RTB Bor (Serbia ZiJin Copper doo Bor), has built a new air separation unit, designated ASU 3 (Air separation unit 3). The new plant was built on the existing location of the Messer Tehnogas factory. On the existing location, an air separation facility named ASU2 was previously built, the primary purpose of which was to supply gaseous oxygen to the Copper Smelter in Bor.
Delta Inženjering was the contractor for the installation of pipelines and pipe fittings with accompanying works and the installation of mechanical equipment of the ASU3 Bor facility.
Comita
Expand of the Banatski Dvor Underground Gas Storage Facility
Gazprom eksport and JP Srbijagas Novi Sad concluded a memorandum of understanding by which the parties agreed to implement the project to expand the Banatski Dvor underground gas storage facility to increase capacity:
- The active volume of the tank should be expanded to a maximum of 711 million Nm³.
- The injection rate should be increased to a design maximum of 5.50 million Nm³/d.
- Withdrawal rates from existing and expansion facilities must reach a maximum withdrawal rate of 9.48 million Nm³/d.
Delta Inženjering is engaged to prepare project documentation.