Articles by: mozzy

JP Srbijagas

Delta Inženjering has signed a contract relating to the design services of the main gas pipeline Niš-Dimitrovgrad. The engineering team of Delta Inženjering was engaged in the nostrification of the

Opširnije

Messer Tehnogas

Delta Inženjering has developed a project for installation of a new air compressor with capacity of 105.000Nm3/h for the needs of operation of the air separation plant at the factory of Messer

Opširnije

Henkel BIH – Bileća

Delta Inženjering has signed a contract with Henkel factory Bileća on the preparation of preliminary and main designs for the factory complex of the adhesives factory Henkel in Bileća on 2 acres

Opširnije

Grundfos Srbija

Within the factory for production of pumps and pressure boosters Grundfos Serbia in Inđija has been constructed a very important facility – wastewater treatment and recycling plant.

Opširnije

Drenik ND

Delta Inženjering is also quite involved in the field of ecology and environmental protection. At the factory Drenik ND we are engaged in the preparation of project documentation and the

Opširnije

JKP Beogradske Elektrane

JKP Beogradske elektrane – conceptual design, basic design, project for the construction permit and project for construction and obtaining of administrative documentation for the cogeneration

Opširnije