FIAT Kragujevac
Delta Inženjering contracted several business arrangements with a company FIAT Automobiles Serbia during 2013 year.
Sprinkler system in a building no.5, Assembly building. An area of about 40,000 m2, on which has been carried assembly of Fiat 500L for a long time, is covered by a sprinkler installation.
Reconstruction of the building no.7, storage for prepared components of the cars, was also a contractual obligation of our company.
Visually and aesthetically the most impressive work that our company completed in 2013 was certainly a Showroom on the ground floor of the building no.18.